Portion Of I-4 To Be Shut Down For Several Overnights In Daytona Beach

Posted

Daytona Beach, FL - FDOT is giving motorists a heads-up about multiple night time closures of I-4 from I-95 to U.S. 92.

Construction activities require multiple nightly closures of I-4 in both directions between the I-95 interchange and the U.S. 92 interchange as well as the off-ramp from southbound I-95.

Motorists need to look for the well-marked detour signs. The work will take place between 10 p.m. and 6 a.m. beginning this Sunday night, August 4th through Sunday, August 11. Weather conditions could cause the shutdowns to happen a couple of extra nights.

What: Closure of Eastbound and Westbound I-4 between the I-95 interchange and the U.S. 92 (ISB) interchange (exit 129)

How it will work:

  • Eastbound I-4 traffic headed to northbound and southbound I-95, will be directed to take Exit 129 to eastbound U.S. 92 (ISB) where I-95 will be accessible.
  • Eastbound I-4 traffic headed to S.R. 400 (Beville Road), will be directed to take Exit 129 to eastbound U.S. 92 (ISB), then take southbound Williamson Boulevard to S.R. 400 (Beville Road).
  • Westbound S.R. 400 (Beville Road) traffic headed to westbound I-4 will be directed to northbound Williamson Boulevard to westbound U.S. 92 (ISB) to access I-4.
  • Northbound and southbound I-95 traffic headed to westbound I-4 will be directed to take westbound U.S. 92 (ISB) to access I-4.
  • The westbound S.R. 400 (Beville Road) ramps to northbound and southbound I-95 will be open.

What: Closure of the Off-Ramp from Southbound I-95 to Eastbound U.S. 92 (ISB)

How it will work: Traffic will be directed to exit at westbound U.S. 92 and take southbound Tomoka Farms Road to Bellevue Avenue, and take northbound Williamson Boulevard to eastbound U.S. 92 (ISB).

featured